Finnsementti OY
Finnsementti OY, Uleåborg, Finland
Cement terminal in Oulu harbor. Turnkey delivery.
The project includes engineering, manufacturing, installation and start up for a complete cement terminal.
The terminal handles intake of cement from ships, storing cement in 2 silos and filling bulk trucks with cement.
The terminal operates without personnel. Truck loading is operated by truck drivers.
The installation includes:
- Transport piping from quay to silos, capacity up to 400 tons/hour.
- Diverter for transport to two silos. Dedusting equipment.
- 2 silos 9 000 tons and 5 000 tons cement.
- Truck loading building.
- Truck scale. Control equipment for truck loading ordered amount of cement.
- Transport equipment, capacity 200 tons/hour for dust free truck loading from silos.
The truck is placed on the truck scale and a screw conveyor with loading spouts is moved to the inlets in the truck tanks. - Control equipment for the complete installation. Communication with the client’s business system.
- Electric equipment and installation.
The project was completed in January 2012.