Fortum Värme AB
Fortum Värme AB, Stockholm, Sweden
Equipment for storage and unloading of fly ash and bottom ash from Fortum Värmesnew biofuel fired boiler in Värtahamnen Stockholm. Delivery includes engineering, manufacturing, assembly and commissioningof a plant for receiving fly ash and bottom ash from boiler KVV8 to 2 silos and unloading for bulk car and train.
The equipment includes:
- 2 site-built, self-emptying and Insulated silos in steel of 500 m3 net.
- Unloading for bulk car and train with a transportable unloading conveyor max 160 m3 / hour.
- Electrical equipment and installation.
Silo construction began on January 7, 2015, machine assembly began in March 2015 and the facility will be ready for use in the summer of 2015.